Hotel Marques de Riscal, Elciego, Spain - The PERI UP Rosett modular scaffold allowed optimal adjustment to the complicated building geometry.

Project Overview

Together with our customers we create great things. Whether scaffolding, skyscrapers, bridges or tunnels, we will show you which projects we have realized together with our customers.

All Projects

bvlgari-hotel-dubai-alec-peri-formwork
Absolute World, Missisauga, Canada - One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.
habtoor-residence
Marina Bay Sands, Singapore - The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
al sendian tower lusail marina
Abraj Quartier
PERI UP shoring system used at various heights supporting the slab formwork
Al Hamra Tower, Kuwait City, Kuwait - Already during the construction phase, the Al Hamra Tower stood out through its timeless elegance which was achieved by turning the external facade by 130 degrees.
Salwa Resort
Construction of the Barwa Commercial Avenue, Doha, Qatar
Sewage plant As Samra, Jordan - With the selected PERI formwork and scaffolding systems, the construction team was able to cost-effectively fulfil all requirements in spite of the tight construction schedule. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.
Lock facilities, Panama Canal, Panama - More than 12 months after starting the development work on the Panama Canal, the dimensions and the massive structural elements are clearly visible.
Zahid Business Park
Msheireb Metro Station, Doha
Nile river barrage Naga Hammadi, Egypt - The variable VARIO girder wall formwork, together with SKS climbing scaffold, formed large area transportable units.
Sheikh Khalifa Bridge, Abu Dhabi, United Arab Emirates - The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
Edificio Ágora, Valencia, Spain - A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
sohar-project-peri-pd8
Albian Sands, Fort McMurray, Canada - Through the planning and supply of formwork and scaffolding from one source, the MULTIFLEX slab formwork and PERI UP shoring could be perfectly matched.
LNG liquid gas reservoirs, Cameron, USA - In the US state of Louisiana, three enormous liquid gas tanks were simultaneously realized using PERI know-how. Each of the structures has an 80 m diameter and a wall height of 44 m.
Los Ramones II Pipeline, San Luis Potosi, Mexico
Cement plant Ivano-Frankowsk, Ukraine - For extending the cement plant, engineers from PERI Ukraine designed a comprehensive and sophisticated formwork and scaffolding solution.
Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser.
Eemshaven Power Plant, Netherlands - For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.
Power plant Belchatow, Poland - The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
Motorway bridge over the Rio Sordo, Vila Real, Portugal - The 2.00 m wide shoring scaffold sections are connected longitudinally by means of heavy-duty spindles and push-pull props to form shoring towers.

Interested in how PERI can support your next project?

Call us on +974 4411 4816 to discuss your requirements further.

Contact us